San Martin, CA · Est. 1977 · 3rd Generation
47 years of earthwork in Morgan Hill, Gilroy & San Martin. Every cut, every bore, every foot of underground utility we've placed is in the hands of crews who still live on these roads.
Project Record
Not a portfolio deck. Real projects — named, scoped, completed — across South County and the Central Coast.
Clean California Plaza public infrastructure: underground French drain system, pedestrian-grade concrete paving, site lighting, street furniture, ADA compliance throughout. Delivered on schedule for the City of Gilroy.
Commercial Public WorksStorm drain, sanitary sewer, domestic water, and dry utilities installed across Santa Clara, San Benito, Monterey, and Santa Cruz Counties. Every trench grade-cut with the same crews for four decades.
Wet & Dry UtilitiesFull machine-control fleet running Trimble GCS900. 48-hour CAD-to-grade model turnaround, ±0.1 ft tolerance. Eliminates staking rework and accelerates mass grading for large residential and commercial pads.
Technology-Led EarthworkScope Qualification
We scope fast. Select your path — we'll match the right crew lead to your project type before we talk numbers.
Core Capabilities
Stakeless machine control means no grade stakes to disturb, no survey crews blocking production, no rework. We model your CAD files and run them directly on the blade — 48 hours from file to first pass.
Trinchero has been our go-to grading contractor on South County projects for over a decade. Their crew knows this clay like nobody else — they read the ground before the plans do.
Submit your project details and we'll assign a senior crew lead to your scope review.
Response within 1 business day — no runaround, no junior estimator.
Capabilities · Est. 1977 · Licensed CA C-12 / A
From first cut to final surface — complete heavy civil packages across Santa Clara, San Benito, Monterey, and Santa Cruz counties. One contract, one crew lead, one standard.
GPS-guided stakeless grading, mass excavation, and building pads held to ±0.1 ft tolerance. Cut and fill balanced in real time, verified against the CAD model.
GPS Stakeless FleetWet and dry utility systems, storm drain, and engineered French drain installations — placed by crews who have run underground lines through this ground for four decades.
Storm & DrainageRoadway paving and surface treatment engineered for South County soil movement — from rural connector roads to finished commercial frontage.
RoadworkPedestrian-grade concrete, plazas, site lighting coordination, and street furniture — ADA compliance built in from the first form, not patched in at closeout.
ADA ThroughoutSWPPP-certified, OSHA-compliant delivery for cities, counties, and public agencies — documentation, compliance, and schedule discipline included by default.
MunicipalCAD to grade model in 48 hours. Real-time cut/fill reporting from the cab. Zero physical stakes on site — fewer delays, tighter tolerances, cleaner handoffs.
Field DataProject Record · City of Gilroy · Commercial Public Works
Clean California Plaza public infrastructure in the heart of downtown Gilroy — scoped, built, and delivered on schedule for the City.
How It Was Delivered
Contact / Intake · Response Within 1 Business Day
Tell us what you're building. A senior crew lead — not a junior estimator — reviews every scope request.
SWPPP Certified · OSHA Compliant · Fully Insured · Licensed CA C-12 / A Contractor